"The above projects were constructed in 1995. This project consisted of Cold-In-Place recycled asphalt. Two CIPR sections were implemented; 61mm CIPR, 46mm (0.15) and 61mm CIPR respectively. Two control sections were also included; 61mm(0.2) 85/100 grade B and 30mm (0.5") HMA (Maintenance Overlay). This project is classified as a formal experimental project through the year 2001. The Federal Experimental number is MT98-01."