ePubs
The open archive for STFC research publications
Home
About ePubs
Content Policies
News
Help
Privacy/Cookies
Suggest an Enhancement
Contact ePubs
Full Record Details
DOI
10.5286/raltr.2007023
Persistent URL
http://purl.org/net/epubs/work/50634
Record Status
Checked
Record Id
50634
Title
Accelerator design concept for future neutrino facilities
Contributors
M Apollonio
,
JS Berg
,
A Blondel
,
A Bogacz
,
S Brooks (STFC Rutherford Appleton Lab.)
,
J-E Campagne
,
D Caspar
,
C Cavata
,
P Chimenti
,
J Cobb
,
M Dracos
,
R Edgecock (STFC Rutherford Appleton Lab.)
,
I Efthymiopoulos
,
A Fabich
,
R Fernow
,
F Filthaut
,
J Gallardo
,
R Garoby
,
S Geer
,
F Gerigk
,
G Hanson
,
R Johnson
,
C Johnstone
,
D Kaplan
,
E Keil
,
H Kirk
,
A Klier
,
A Kurup
,
J Lettry
,
K Long
,
S Machida (STFC Rutherford Appleton Lab.)
,
K McDonald
,
F Méot
,
Y Mori
,
D Neuffer
,
V Palladino
,
R Palmer
,
K Paul
,
A Poklonskiy
,
M Popovic
,
C Prior (STFC Rutherford Appleton Lab., and Oxford Univ.)
,
G Rees (STFC Rutherford Appleton Lab.)
,
C Rossi
,
T Rovelli
,
R Sandström
,
R Sevior
,
P Sievers
,
N Simos
,
Y Torun
,
M Vretenar
,
K Yoshimuray
,
MS Zisman
Abstract
This document summarizes the work of the Accelerator Working Group (AWG) of the International Scoping Study (ISS) of a Future Neutrino Factory and Superbeam Facility. The main goal of the activity was to reach consensus on a baseline design for a Neutrino Factory complex, including proton driver parameters, choice of target, front-end design, acceleration system design, and decay ring geometry. Another goal was to explore the commonality, if any, between the proton driver for a Neutrino Factory and those for a Superbeam or Beta Beam facility. In general, the requirements for either of the latter facilities are less stringent than those for a Neutrino Factory. Here, we discuss concepts, parameters, and expected performance of the required subsystems for our chosen baseline design of a Neutrino Factory. We also give an indication of the main R&D tasks -- many of which are already under way -- that must be carried out to finalize facility design approaches.
Organisation
ISIS
,
PPD
,
PPD-NEUTRINO-EXP
,
PPD-ACCEL-RD
,
PPD-NEUTRINO-FACTORY
,
NEUTRINO_FACTORY
,
ASTeC
,
ASTeC-IB
,
ISIS-ACCEL
,
CI
,
Neu-fact
,
STFC
Keywords
neutrino factory
,
physics
,
engineering
,
muon accelerator
,
ISS Accelerator Working Group
,
particle accelerator
Funding Information
Related Research Object(s):
49195549
Licence Information:
Language
English (EN)
Type
Details
URI(s)
Local file(s)
Year
Report
RAL Technical Reports
RAL-TR-2007-023. STFC, 2007.
RAL-TR-2007-023.pdf
2007
Showing record 1 of 1
Recent Additions
Browse Organisations
Browse Journals/Series
Login to add & manage publications and access information for OA publishing
Username:
Password:
Useful Links
Chadwick & RAL Libraries
SHERPA FACT
SHERPA RoMEO
SHERPA JULIET
Journal Checker Tool
Google Scholar